The Facts About Termite Control Techniques Uncovered

Termite Control Techniques - An Overview


Many new buildings use a termicide treated coating of soil surrounding and under the building. This forms an integrated barrier, together with the physical techniques mentioned above. The termicide is applied to the soil under the slab and around the footings, pipes, conduits and other structures of the house during construction to make a vertical barrier.

Timber used to construct houses, outbuildings, fences and other outdoor structures can be treated with substances. These are commonly referred toas treated timbers and ought to be considered at the time of designing or constructing the buildings.

The 3-Minute Rule for Termite Control Techniques


To successfully incorporate termite obstacles into existing buildings, strategic drilling through concrete slabs, porches, floors and wall footings may be needed, as well as under ground treatment.

Building and Energy recommends only licensed pest controllers carry out this work. Chemical baits Strategically put bait stations can be employed to lure termites to a food supply, for example dry wood or newspaper refuse. About 30 bait stations are needed for a normal home and they need to be inspected regularly to evaluate termite activity. .

Once the termites are attracted to the bait station, a specific termicide is added that sticks to the termite.

10 Easy Facts About Termite Control Techniques Explained


To deal with termites in the garden, specialised pest managers drill into wood or the trunk of a tree to insert temperature probes that help to locate the termite nest.  Despite routine inspections of the garden, termites may still enter the house. In the house, first indicator may be a small discolouration of a wall , followed by warping if timber panelling is used to line the wall.

Make time to investigate the size and nature of the issue as well as the options offered for termite eradication. .

Whichever system you select, it's important to perform routine inspections in particular inspect your property every six months for any obvious signs of infestation. Building and Energy recommends you arrange for an inspection by a licensed pest control operator at least once per year to search for signs of infestation and also to undertake any preventative steps. .

A Biased View of Termite Control Techniques


For existing buildings, where you've found signs of infestation, chemical treatment is usually the only option for destroying the termite nest. This treatment can include re-establishing a compound and/or physical barrier and regular inspections to detect any ongoing or new termite activity.

Treatment with a termicide directly into tunnels of this nest where termites are known to be more active can reduce numbers, but it seldom discover this info here eliminates the colony entirely unless it is used in conjunction with another method.

The smart Trick of Termite Control Techniques That Nobody is Talking About


When buying an existing house, Consumer Protection recommends including a White Ant Certificate clause in the Offer and Acceptance form. This is intended to make certain that the residence is free of termites and there is no structural damage from any prior infestation. A separate fact sheet about the need for timber pest inspections and reports when buying home can be found from the Department of Commerce by contacting the Consumer Protection Advice Line on 1300 304 054. .

If you are constructing a new house or building or renovating an existing one you need to obey the termite risk management and barrier requirements of the National Construction Code (NCC) and relevant standards. In most cases a building permit will be required before carrying out building work and the details of the sort of termite barrier should be submitted as part of the building permit application procedure.

Some Known Incorrect Statements About Termite Control Tenting The Of Termite Control Tenting

Indicators on Termite Control Tenting You Should Know


The NCC requirements aim to reduce the risk of termite damage to main building elements which are mostly the structural elements of a building butdo not include non-structural elements such as cabinet work and furniture.

It is a requirement of the NCC that a durable notice be permanently fixed to the building in a prominent location, such as in a tube or the like. The notice should Learn More indicate the type and method of termite risk management and the date that the system was installed, along with the installers or manufacturers recommendations for the extent and frequency of future inspections.

For specific information about termite protection for a proposed new home, contact a building surveyor, a contractor or architect or a licensed pest control professional.

3 Simple Techniques For Termite Control Techniques


If you've had building work carried out in the previous six years and the builder did not offer termite protection as required by the NCC, you can refer the matter to the Building and Energy.

Plumbing leaks, drainage issues and roof leaks should all be addressed quickly, as moist conditions attract termites.

Examine This Report on Termite Control TentingSome Known Incorrect Statements About Termite Control Techniques

Termite Control Technician Job Description Fundamentals Explained


Garden beds and plants should be kept away from direct contact with walls. Hard paving should be substituted.

Leave a Reply

Your email address will not be published. Required fields are marked *